Vertical Cedar Siding Installation
Lap siding can be installed horizontally or vertically.
Vertical cedar siding installation. For inside corners use vertical siding. In a vertical siding installation most of the expansion is downward. For example if the total expansion equals 3 4 3 8. Here are some key tips to a successful cedar siding installation.
Install rev f2 trim and corner for corners and trim use nucedar color trim package. This allows for a space between the wood and the structure. So instead of allowing equal space for expansion at both ends of a vertical panel leave more space at the lower end. You can miter or butt the vertical siding together and seal the joint with adhesive.
Real cedar is a premium siding material so it costs at least twice as much as budget options such as vinyl or aluminum. If your home has cedar shakes and shingles you re going to create an exceptional look with vertical cedar siding. Installing cedar siding is a great choice for natural siding material. Standard trim and corners are available as well as our j pocket trim and corners for use with our vertical siding.
It s fairly easy to install which will cut back on your labor costs and it is resistant to cupping and cracking. Yes we re aware that cedar is also a wood but it is in such demand that it deserves its own section. Do not nail through overlaps. It can also be butted against adjoining walls with a trim strip used to cover the joint.
This is particularly important for vertical. Using a carpenter s pencil and a 6 level scribe a straight vertical line directly along the exterior surface where the outer edge of the starter plank will sit. Allow for 1 3 of the total expansion at the top of a panel and 2 3 of the total expansion at the bottom. For vertical siding installation the strips should be attached horizontally.
Simple ranch cape style home. This is equivalent to spending 9 000 11 250 for cedar lap siding installed on a 1 500 sq ft. For horizontal applications start with the bottom course and work up with the channels pointing upwards. Hold the starter plank up to the level line and secure it into the plywood backing using a nail gun and stainless steel 2 nails.
When butt jointing siding cut ends at 45 degree angles to form an overlapping joint.